About load operations

Load initiation and load dialog box

Update to Project (from Monitor)
Update with Contents (to Project)
See the on-line help for information about these commands.
There is also the Upload command which allows you upload data for selected objects
from the controller to the Monitoring database. This is how the monitoring database is
made to reflect the same data which is loaded in the controller. See
Monitoring database
Load initiation and load dialog box
You can initiate a load operation for selected components from either the Project tree or
Monitoring tree using one of the following commands in the Control Builder Controller
menu.
Load
Load with Contents
Either command invokes the Load Dialog box. The following figure shows a sample
Load Dialog box invoked for a load with contents operation for a CPM. It provides a
brief description of the dialog box features for quick reference. The appearance of the
dialog box will vary depending on the current load circumstances such as whether this is
an initial load or a re-load operation.
142
for more information.
The load operation is inherently an offline function. The Load Dialog
box provides the ability to automatically inactivate a component
during a load and then return the component to its active state. Do
not use this automatic inactivate/activate function if your process
cannot tolerate the load disruption and consequent delay in
activation. In this case, you must manually toggle the component
state through the Monitoring tab in Control Builder.
Experion C300 Controller User's Guide
Honeywell
Upload to the
R301.1
11/06