MacDon M1170 Operator's Manual page 185

Windrower
Table of Contents

Advertisement

22. Start the engine.
23. Remove header float when prompted by the Harvest
Performance Tracker (HPT).
NOTE:
If not prompted by the HPT to remove float, remove float
manually. Refer to
Removing and Restoring Float, page
24. Lower the header to the ground with HEADER DOWN
switch (A).
25. Press HEADER TILT switches (B) as required on GSL to
release load on center-link.
26. Windrowers with self-aligning center-link:
a.
Press the REEL UP switch (C) to disengage center-link
from header.
b. Proceed to Step
27. Windrowers without self-aligning center-link:
a.
Shut off the engine and remove the key.
b. Disconnect center-link by lifting release (B) and lift
hook (A) off header.
CAUTION
Check to be sure all bystanders have cleared the area.
c.
Start the engine.
28. Back windrower away from header.
29. Reinstall pin (A) into header leg, and secure with
hairpin (B).
214733
28, page
169.
OPERATION
189.
A
Figure 4.125: GSL
B
Figure 4.126: Hydraulic Center-Link
B
A
Figure 4.127: Header Stand
169
C
B
A
Revision A

Advertisement

Table of Contents
loading

Table of Contents