5.1 Introduction

This section descr ibes routine maintenance
procedures including general monitor maintenance and
Chemcassette
and pyrolyzer analyzer maintenance.
®
The Maintenance chapter includes:
5.3 Chemcassette® Analyzer Maintenance
5.4 Replacing an Analyzer
5.5 Remove and Replace Pyrolyzer Filters
5.6 Remove and Install Pumps
5.7 Remove and Install Power Supplies
5.8 Clean the Touch Screen
5.9 PLC Module Battery Backup Check
5.10 File Maintenance
5.11 Optics Cleaning
Most of the procedures in this section use functions in
the Maintenance Window. To reach the Maintenance
Window, touch Main Screen, Menu and then
Maintenance.
Section 5 - Maintenance

5.2 Maintenance Schedules

Perform maintenance following the schedule in
Table 5-1. See
Appendix A Replacement and
Consumable Items
items
Item
Sample line filters (end of line)
Teflon Corrosive Filter
Membrane
(end of Iine)
Teflon Corrosive Filter
Cabinet filter
(located in front of pump
module)
Pump vane replacement
Pump stem and o-ring
Proportional valve filter (inside
analyzer)
Particulate Filters
Pyrolyzer Freon Filter
Acid Scrubber Filter
Alternate Pumps
Optics Cleaning
System File Maintenance
Table 5-1. Suggested Maintenance Schedule
5-2
for part numbers of maintenance
Schedule
3-6 months
1 month
3 months
3 months or as needed
2 years operation per
pump
6 months
1 year
3-6 months
1 month or as needed
6 months
6 months
1 year or as needed
1 year or as needed