2.6.1 Connecting AC Power

AC Source Requirements:
Operating Voltage: 110 or 230 VAC ± 10%
(under load) @ 50/60 Hz; 15 Amps maximum,
single phase.
The Vertex M System requires a dedicated AC circuit
rated at either 110 or 230 volts, 50/60 Hz, 15 Amp single
phase. Line voltage should fluctuate no more than
± 10%. The external switch must be clearly labeled and
installed in accordance with local electrical codes. Input
power cable should be #14 AWG minimum. The safety
ground wire must be the same or larger gauge as the
line wires. Connect AC power connection to the three-
position terminal block in the side panel of the rack.
See Figure 2-2.
Line
Figure 2-2. AC Power Connection
Section 2 - Installation
AC Input
Neutral
Ground

2.6.2 Power On/Off

An internal rack power switch is located behind the
door.
After performing self-diagnostics, the Vertex M System
main screen opens and the system returns to the same
state it was in prior to power down.
Power Switches and Indicators
Rack Power Switch
Figure 2-3. Rack Power Switch
WARNING
Hazardous voltages may exist at the Alarm
Contacts in this unit with the power switch
turned off. Insure power is disconnected at
the source prior to servicing alarm contacts.

2.7 Data Acquisition System

The data acquisition computer or DAq is the main
computer in the Vertex M System. System display and
operator control are through an LCD touch screen with
on-screen keyboard or the external keyboard on top
of the unit.
2-6
Analyzer / Pyrolyzer

Advertisement

Table of Contents
loading

Table of Contents