Honeywell Vertex M Technical Handbook page 149

Continuous gas monitor
Hide thumbs Also See for Vertex M:
Table of Contents

Advertisement

Event
Event List Desc.
Number
(Short)
122
LIT NO REF
123
LIT CHAR FAIL
124
LINE FAIL
125
LIT
COORDINATION
126
OPTICS DEBRIS Possible debris
Section 6 - Troubleshooting
Event History
Data Field
Description
LIT has no
bitmask
reference
of points
skipped,
1-255
LIT
Observed
Characterization
cracking
failed
pressure (in
Hg)
Sample line
Observed
leak detected
cracking
pressure (in
Hg)
Coordination
Error code 1.0
failure during
- 6.0
LIT
Diagnostic
in optics block
Counter
Problem
Analyzer has no record or
Point was disabled
correct cracking pressure
in configuration
when previous LIT
characterization was
performed
Inadequate cracking
Check valve not installed
pressure measured
during characterization
Sample tubing cut or
leaking
Inadequate cracking
Sample tubing cut or
pressure measured
leaking
during the monitoring by
Ambient pressure at
the optional Line Integrity
sampled point differs
Test
from Vertex M exhaust
by more than 0.3 in Hg
(1 KPa)
Check valve not seating
LIT test not performed
Some analyzers were in
because analyzers could
LOADCC or other special
not coordinate the test
mode
Software anomaly
Optics signal has been
Debris in optics block
erratic on at least 3
windows
6-9
Possible Cause
Perform characterization
or disable LIT test for
point in configuration
Install check valve or
disable LIT test in config
Replace tubing
Replace tubing
Revise installation
Disable LIT for affected
point
Replace check valve
None needed
If repeated, notify
Honeywell Analytics
Service
Clean optics block as
shown in
Recovery
Section 5.11

Advertisement

Table of Contents
loading

Table of Contents