ABB REACT 2 Series Product Manual page 71

Solar inverter
Hide thumbs Also See for REACT 2 Series:
Table of Contents

Advertisement

MTR-1PH
line cable
with for correct measurement of the current; in fact the direction of the ar-
REACT-MTR-1PH
row indicates the supply point of the electric energy (as indicated in the
diagram).
INPUT :
110/230 V
50/60 Hz
10 mA max
- Power the REACT-MTR-1PH while keeping the REACT2 system off
- Action a load (of at least 50W) in the house so that the REACT-MTR-
1PH records drawing of current from the grid
- Check that the LED MEASURE (red) is permanently on. This con-
dition indicates that a drawing from the grid is recorded and so that
the reading of the direction of the current by the REACT-MTR-1PH is
correct.
Here below is set out the behaviour of LEDs on the REACT-MTR-1PH:
MEASURE LED
Permanent Green
STATUS LED
Permanent red
Green (steady)
Flashing red and
. The arrow corresponding to the hole for the feeding of the
51
, indicates the direction of insertion which must be complied
52
Serial communication absent or malfunctioning
Flashing
Serial communication present
Drawing of energy from the grid
Self-consumption (maximum exchange ±20W)
Feeding of energy from the grid
green
INPUT :
110/230 V
50/60 Hz
10 mA max
- 71 -
5 - Installation
description
description
REACT-MTR-1PH

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

React2-uno-3.6-tlReact2-uno-5.0-tl

Table of Contents