ABB REACT 2 Series Product Manual page 59

Solar inverter
Hide thumbs Also See for REACT 2 Series:
Table of Contents

Advertisement

BATT
BATT
XL connection
Standard
cable
connection cable
XL connection
cable
operation of electronic equipment, with the consequent hazards.
the space available does not allow this arrangement, position
the inverters in a staggered arrangement (as shown in the
- Two or more REACT2-BATT can be installed one above the other.
- Do not install the REACT2-BATT above the REACT2-UNO.
The ambient temperature of the installation location should be
between 5°C and 30°C to guarantee the optimal operation of the
battery unit (REACT2-BATT). Here below are the functions available
from the system on the basis of the ambient temperature:
T1 - Optimal operation of the REACT2 system
T2 - Correct operation of the REACT2 system with possible reduction
of power
T3 - Operation limited to the inverter part only. Management of the
battery is disabled.
T3
T2
-20
-10
0
+5
using the standard cable. Moreover in case of greater distances, the
meter cables length).
Hardware and software maintenance on REACT2-UNO entails opening
the front cover. Check that the correct installation safety distances are
observed in order to allow routine check and maintenance operations.
Install on a wall or strong structure suitable to bear the weight.
Install at a height which takes into consideration the weight of the
appliance and in a position which is suitable for servicing, unless
suitable means are provided to carry out the operation.
If possible, install at eye-level so that the synoptic can be seen easily.
- 59 -
5 - Installation
T1
T2
T3
+30
+40
+55
°C