STEP 4 - Type of coupling, Inverter country standard, Input mode,
- DC coupled (new installations). Select this mode if the in-
verter is connected to the AC network and to the photovol-
taic generator.
mode if the inverter is connected only to the AC network
and in combination with a standard inverter connected to
the photovoltaic generator.
Country standard
Set the grid standard of the country in which the inverter is
installed.
From the moment that the grid standard is set,
you have 24 hours to make any changes to the
value, after which the "Country Select > Set Std."
functionality is blocked, and the remaining time will
have to be reset in order to have the 24 hours of
operation available again in which to select a new
grid standard (follow the procedure "Resetting the
remaining time for grid standard variation" descri-
bed in the relevant section).
Input mode
ration was selected)
- Indipendent
- Parallel
See the relevant section of this manual to know how to physi-
cally set the input mode
Meter
When a meter device is connected to the inverter, it's reque-
sted to select the meter model:
- None (where system is installed without meter)
- REACT-MTR-1PH (single-phase)
- ABB 3PH (three-phase)
- ABB 1PH (single-phase)
If a 3PH energy meter (ABB B23, B24) is used in
the system as single-phase inverter, it will be ne-
cessary to select ABB 3PH and the phase to which
the inverter is connected.
- 108 -
7 - Operation
-
Need help?
Do you have a question about the REACT 2 Series and is the answer not in the manual?
Questions and answers