Mounting Instruction - React2 Multi Battery System - ABB REACT 2 Series Product Manual

Solar inverter
Hide thumbs Also See for REACT 2 Series:
Table of Contents

Advertisement

M
ounting instruction - REACT2 multi battery system
The underlying procedure is related to the side-by-side installation of REACT2-BATT. Alternatively,
CABLE-KIT" cable kit (2 meter cables length).
20
of the second REACT2-BATT so
that it is perfectly level on the wall and
use it as a drilling template. To aling
the brackets of the two REACT2-
BATT (in case of side-by-side
installation) use the reference point
and follow the steps as in the picture.
to choose an appropriate type of
screw anchors for the attachment
points. The choice must be based
on the type of support (wall, frame or
other support), the type of anchors
to be used, and their ability to
support 4 times the inverter's weight
(4x50Kg=200Kg).
the support.
Lift the REACT2-BATT up to the
bracket and insert the heads of
two anchor points (present on
the back of the battery unit) into
the slots
on the bracket
Risk of injury due to
the heavy weight of
the equipment.
B
20
to
20
.
- 66 -
2 x
9 mm
Ø
20
B
21
Hang up the lower part of the REACT2-BATT
to the wall using the two anchor points
(holes diameter 11 mm).
5 - Installation
02
26