Maintenance
- Rebooting the System
Rebooting the System
Any time you load a new software image, you must reboot the system. When a power cycle or reboot is
performed, the BNP will retain previously saved configuration settings. Only the parameters of newly
introduced features need to be set when the system is upgraded and rebooted.
You can reboot the BNP either by using a power cycle or by using the reboot option from the BNP
Element Manager.
Rebooting the BNP
The BNP does not have a power switch. To power the unit down, disconnect the power cable from the
connector as described in your BNP installation guide.
A system reboot can be performed by Administrative or Operator user accounts.
Use the Reboot option from the BNP Element Manager. The system will prompt for your Administrative
or O
perator password, and for confirmation of the reboot.
BNP Element Manager main menu --> Maintenance (Alt m)--> Reboot (Alt b)
Menu Path
1. At the Password Verification dialog, enter your
password and click OK.
2. At the Reboot confirmation screen, click Yes to continue
or No to dismiss the dialog and to cancel the reboot.
Selenio
TM
BNP User Guide, Release 3.7.1
196