SiUS34-801A_b
10.Test Operation
10.1 Installation Process
Below Figure shows the installation process. Install in the order of the steps shown.
11. Additional Refrigerant Charge and Check Operation
10.2 Procedure and Outline
Use the following procedure to conduct the initial test operation after installation:
VRVIII R-410A Heat Recovery 60Hz
3. Selection of Location
4. Inspecting and Handling the Unit
5. Placing the Unit
7. Field Wiring
8. Airtight Test and Vacuum Drying
9. Pipe Insulation
10. Checking of Device and Installation Conditions
13. Test Run
6. Refrigerant Piping
Operations which require the
power to be turned on.
Test Operation
219