10.Test Operation

10.1 Installation Process

Below Figure shows the installation process. Install in the order of the steps shown.
11. Additional Refrigerant Charge and Check Operation

10.2 Procedure and Outline

Use the following procedure to conduct the initial test operation after installation:
VRVIII R-410A Heat Recovery 60Hz
3. Selection of Location
4. Inspecting and Handling the Unit
5. Placing the Unit
7. Field Wiring
8. Airtight Test and Vacuum Drying
9. Pipe Insulation
10. Checking of Device and Installation Conditions
13. Test Run
6. Refrigerant Piping
Operations which require the
power to be turned on.
Test Operation
219