Siemens SIPROTEC 4 7VK61 Manual page 121

Breaker management device
Table of Contents

Advertisement

contacts is interrupted. This information is provided to the circuit breaker failure protection by the central
function control of the device (refer to Section
The 3-phase starting signal "Start L123" is generated if there are start signals for more than one phase. The
input "BF Start w/o I" (e.g. from Buchholz protection) operates only in 3-phase mode. The function is the same
as with common phase initiation.
The additional release-signal
tions. Initiation can be blocked via the binary input
tion relay).
[logik-7vk61-anwurfbed-1-pol-ausloese, 1, en_GB]
Figure 2-39
SIPROTEC 4, 7VK61, Manual
C53000-G1176-C159-5, Edition 05.2018
>BF release (if assigned to a binary input) affects all external initiation condi-
Initiation conditions for single-pole trip commands
2.6 Circuit breaker failure protection (optional)
2.8.1 Function
Control).
>BLOCK BkrFail (e.g. during test of the feeder protec-
Functions
121

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents