Allocation Of Crankshaft Bearing Shells (Classification) - Volkswagen Amarok 2011 Workshop Manual

4-cylinder injection engine (2.0 l direct injection engine, turbocharger)
Hide thumbs Also See for Amarok 2011:
Table of Contents

Advertisement

4-cylinder injection engine (2.0 l direct injection engine, turbocharger) - Edition 02.2011
7 - Bolt
❑ 10 Nm + 90° further
❑ Renew.
❑ Always renew sender wheel if securing bolts have been unscrewed.
8 - Sender wheel
❑ For engine speed sender -G28-
❑ Can only be installed in one position, holes are offset.
❑ Always renew sender wheel if securing bolts have been unscrewed.
❑ Removing and installing
9 - Thrust washers
❑ For bearing 3.
10 - Bolt
❑ Renew.
❑ Tightening sequence
Crankshaft tightening sequence
– Tighten crankshaft bolts in the sequence -1 ... 5- as follows:
1.
Bolts -1 ... 10- and -arrows - - hand-tighten
2.
Bolts -1 ... 10- - pre-tighten to 65 Nm
3.
Bolts -1 ... 10- - turn 90° further with fixed wrench
4.
Pre-tighten bolts -arrows- to 20 Nm.
5.
Turn bolts -arrows- 90° further using a fixed wrench.
4.2
Allocation of crankshaft bearing shells
(classification)
Bearing shells of the correct thickness are allocated to the cylin‐
der block at the factory. Coloured dots are used to identify the
thickness of the bearing shells.
Which bearing shell is to be inserted at each place in the cylinder
block (upper bearing shell) is marked by letters on the lower seal‐
ing surface or on the front side of cylinder block.
Which bearing shell is to be inserted at each place in bearing cap
(lower bearing shell) is marked by letters on the crankshaft.
The first letter is allocated to bearing cap 1, the second to bearing
cap 2, etc.
⇒ Item 7 (page 40)
.
⇒ page 41
.
Amarok 2011 ➤
41
4. Crankshaft

Advertisement

Table of Contents
loading

Table of Contents