4. If you are not connecting additional Expansion shelves, verify that the Bus
Termination Assembly is inserted into the last SDU Interface (J105) and last SDU
Backup Clock (J106) of the main SDU-2000e shelf, see
Caution: To maintain EMC compliance, use only properly shielded
cabling on all telecom signal wiring, including I/O, clocks, and
Ethernet connections. Ensure that connections are appropriately
grounded.
Recommendation: To aid in viewing and when connecting cables,
install the SDU-2000e chassis at eye level whenever possible.

Making Ground Connections

The procedures for making ground connections for the SDU-2000e are the same as
for the SSU-2000e. Refer to
the procedures for grounding the SDU-2000e.
Making Power Connections
The procedures for making power connections for the SDU-2000e are the same as
for the SSU-2000e. Refer to
procedures to connect power to the SDU-2000e.
12713140-002-2 Revision E – October 2006
Making Ground
Connections, on page 62, and follow
Making Power
Connections, on page 62, and follow the
Chapter 2 Installing the SSU-2000e
Installing the SDU-2000e
Figure
2-14.
SSU-2000e User's Guide
79