Unpacking And Inspecting The Shelf - Symmetricom SSU-2000e User Manual

Synchronization supply unit and distribution unit
Hide thumbs Also See for SSU-2000e:
Table of Contents

Advertisement

Chapter 2 Installing the SSU-2000e

Unpacking and Inspecting the Shelf

Unpacking and Inspecting the Shelf
The SSU-2000e is packaged to protect it from normal shock, vibration, and handling
damage. To avoid damaging the unprotected unit, caution is advised during
unpacking and installation.
1. Unpack all equipment carefully and check it against the purchase order.
2. Inspect the equipment for shipping damage, including bent or loose hardware,
broken connectors, or other visible defects. Notify Symmetricom and the carrier
who delivered the equipment if you suspect damage occurred during transit.
If any items are missing, contact Symmetricom Global Services.
Recommendation: Keep all packaging materials in the event the
system or components must be returned or shipped to another
location.
Preliminary Procedures
Make sure that the following preparations are in place before installation.
Ensure that standard installation tools and materials are available, see
Installation Tools and
The installation site is secured:
– Access to the location can only be gained by service personnel or users
who have been instructed about the reasons for the restrictions applied to
the location and about any precautions that shall be taken; and
– Access is through use of a tool or lock and key, or other means of security,
and is controlled by the authority responsible for the location
Ensure that the system location does not cause electromagnetic interference
with other equipment in the area, see
Considerations, on page 59.
Ensure that adequate ventilation space is available in rack or equipment cabinet
to safely operate the system, see
The SSU-2000e is suitable for installation over concrete or other
non-combustible surfaces only.
58
SSU-2000e User's Guide
Caution: To avoid damage, use proper static control precautionary
measures when handling the modules. Protect the equipment
against electrostatic discharge (ESD) by using a protective
wrist-strap attached to ground and normal equipment grounding.
Materials, on page 59.
Electromagnetic Interference (EMI)
Ventilation
Considerations, on page 60.
12713140-002-2 Revision E – October 2006

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sdu-2000e

Table of Contents