Chapter 4 Commissioning the SSU-2000e

The commissioning tests for the SSU-2000e system are checklist-based operational
tests performed by field engineers at the installation site after completing the
installation, system turn-up, and provisioning to verify that the system is correctly
installed and configured and is operating properly. After performing these tests, the
system is ready to be placed in service.
In This Chapter
Readiness to Test Checklist
Equipment Requirements
Commissioning Tests
Commissioning Test Data Sheet
Commissioning the SDU 2000e
12713140-002-2 Revision E – October 2006
SSU-2000e User's Guide 117