1. Connect one of the system outputs and the PRS signal to the test equipment to
monitor the stability and accuracy. This test should be allowed to run for 24 hours
to collect sufficient data to verify the system output meets specifications.
2. Process the collected 24 hour data and verify that the frequency and stability
(MTIE and TDEV) meet the specifications.
This completes the commissioning tests. The system is ready to be placed in
service.
Commissioning Test Data Sheet
Complete the Commissioning Test Data Sheet
operational readiness of the SDU-2000e.
Table 4-4. Commissioning Test Data Sheet - SDU
EIA-232 Port A communications
MINOR Alarms
MAJOR Alarms
CRITICAL Alarms
Output Section
System Stability and Accuracy (optional)
12713140-002-2 Revision E – October 2006
Test
Chapter 4 Commissioning the SSU-2000e
Commissioning the SDU 2000e
(Table
4-4) as an indicator of
Pass
Fail
SSU-2000e User's Guide 127