Installing The Smart Array P440 Controller - HPE ProLiant XL270d Gen9 User Manual

Accelerator tray
Table of Contents

Advertisement

16. Install the air baffle.
If the 4:1 riser signal cable or Smart Storage Battery are installed in the air baffle, reconnect the cables to
the risers. For more information, see "Installing the air baffle."
17. Install the access panel.
18. Connect all peripheral cables to the server .
19. Power up the server .

Installing the Smart Array P440 Controller

About this task
CAUTION:
Hewlett Packard Enterprise recommends performing a complete backup of all server data before
performing a controller or adapter installation or removal.
To install the component:
Procedure
1.
Back up all server data.
2.
Power down the server .
3.
Disconnect all peripheral cables from the server .
4.
Remove the server from the chassis.
5.
Place the server on a sturdy, level surface.
6.
Remove the access panel.
7.
Remove the air baffle.
8.
Disconnect all cables from the drive backplane.
9.
Remove the drive cage assembly.
10. Remove the air scoop from the storage controller.
72
Installing the Smart Array P440 Controller

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents