Installing The Air Baffle - HPE ProLiant XL270d Gen9 User Manual

Accelerator tray
Table of Contents

Advertisement

Installing the air baffle

About this task
Install the air baffle
CAUTION:
To prevent damage to the server, ensure that all DIMM latches are in closed and locked position before
installing the air baffle.
Procedure
1. Install the air baffle.
2. If removed, connect the 4:1 riser signal cable:
a. Connect the cable to both the connectors.
b. Ensure that the latches are closed.
28
Installing the air baffle

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents