26. If removed, install the HPE Smart Array P542D controller module.
27. If removed, install the expansion board.
28. Connect any required internal cables.
29. Install the drive cage assembly.
30. Connect all cables to the drive backplane.
31. Install all GPUs and GPU blanks.
32. Install the side panel.
33. Connect the 8:1 riser sideband cable to the 8:1 PCI riser modules.
34. Install the air baffle.
35. If removed, install the Smart Storage Battery and connect the cable to the riser connector.
36. Install the access panel.
37. Install the server into the chassis.
38. Connect all peripheral cables to the server .
39. Power up the server .
Hardware options installation
65