3.
Remove the Server Blade .
4.
Place the Server Blade on a flat, level work surface.
5.
Remove the access panel.
6.
Prepare the storage controller/NVMe pass-through board for installation.
7.
Align the storage controller/NVMe pass-through board with the alignment pins and lower it into Server
Blade.
8.
Push the handle down into the closed position to fully seat the storage controller/NVMe pass-through
board.
9.
Install the access panel.
10. Install the Server Blade .
11. Power up the Server Blade .
Remove a drive
1. Determine status of drives from LED Definitions.
2. Back up all Server Blade data on the drive.
3. Remove the drive.
2
1
Remove a drive
33