Procedure
1. Power down the Server Blade .
2. Remove the Server Blade .
3. Place the Server Blade on a flat, level work surface.
4. Remove the access panel.
5. Do one of the following:
•
Remove the storage controller/NVMe pass-through board.
•
Remove the direct connect SATA cable.
6. If installed, remove the internal USB drive. To locate the internal USB connector, see "System board
components."
7. Remove all DIMM baffles.
CAUTION:
Always remove the storage controller/NVMe pass-through board before removing the front panel/
drive cage assembly.
8. Remove the front panel/drive cage assembly:
a. Extend the serial label pull tab from the front of the Server Blade.
b. Remove the two T-15 screws from the front panel/drive cage assembly.
c. Remove the component.
Install the front panel/drive cage assembly
The server has one drive cage assembly.
Procedure
1. Install the front panel/drive cage assembly.
a. Align the pins on the chassis and slide the front panel/drive cage assembly into the server.
b. Secure the component with two T-15 screws.
c. Close the serial label pull tab.
2
1
3
Install the front panel/drive cage assembly
2
35