4.
Removing the Load Roller
(1) Perform steps (1) to (4) to remove the cutter unit.
(2) Remove the Loading guide (bottom) [E]. (M4 x 8: 2 pcs)
(3) Loosen the screw (M4 x 8: 1 pc) on the Tension assembly [A], and remove the Belt [F].
(4) Remove the Pulley [B] (M2 x 6: 1 pc) and Bearing fixing plate [C] (M4 x 8: 1 pc).
(5) Remove the Load roller [D].
A
F
D
E
A: Tension assembly
B: Pulley
C: Bearing fixing plate
D: Load roller
E: Loading guide (bottom)
F: Belt
CHAPTER 13. MASTER MAKING SECTION
13 – 15
RN (Version 1.0)
REMOVING THE LOAD ROLLER
C
B