Download Print this page

APRILIA CAPONORD 1200 Service Station Manual page 77

Advertisement

CAPONORD 1200
No.1 Main Cable Harness.
No.1 License Plate Cable Harness.
No. 25 Large plastic clamp (4.5x280).
No. 9 Small plastic clamp (2.5x160).
No. 4 Rubber clamp (long).
No. 5 Rubber clamp (short).
No. 5 Tyco connector support.
No. 8 Cable grommets.
No. 3 Cable guide.
No. 2 Cable guide for ABS sensors.
No. 1 Cable grommets.
No. 1 Headlamp water seal rubber.
No. 2 Headlamp water seal rubber.
Motorcycle division
The wiring timing is subdivided in three essential sections, as indicated in the figure.
1. Front section
2. Central section
3. Rear section
SPECIAL CHECKS FOR THE CORRECT CONNECTION AND LAYING OF CABLES (ALL VER-
SIONS).
It is extremely important that any security-locks for the following connectors are properly connected and
correctly tightened to ensure proper engine, and therefore, proper vehicle operation.
1. Dashboard connector and cap.
2. Demand Master and Slave connectors, check the closing of the security lock (grey)
3. Adjustable connector, Pick Up and alternator.
4. Gear sensor connector.
5. Side Stand Switch Connector.
6. Coils 1 and 2 connectors on front and rear cylinders.
7. Control unit connectors (7SM).
Electrical system
ELE SYS - 77

Advertisement

loading