4Check On The Plc - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

1
1.6.4
Check on the PLC
■1. Read IC tag (For RFID connection)
Read IC tag with a RFID reader/writer and check that the read data are written into the PLC CPU.
Detailed settings including sequence programs, device settings and other settings required for monitoring, refer to the
following manual.
GT Designer3 (GOT2000) Screen Design Manual
1 - 39
1.6 Checking for Normal Monitoring

Advertisement

Table of Contents
loading

Table of Contents