When Connecting To The Cc-Link Ie Field Network Basic Master Station - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

11.2 System Configuration
11.2.1

When connecting to the CC-Link IE Field Network Basic master station

■1. When connecting to one master station
CC-Link IE Field Network
Basic master station
Controller
CC-Link IE Field Network Basic
master station
*1
Use a cross cable for the twisted pair cable.
*2
GT25-W does not support the option device.
Connection cable
Communication
Type
Cable model
100BASE-TX
Ethernet
Shielded twisted pair cable
(STP) of category 5 or higher
Connection cable
GOT (slave stations)
Maximum
Option
*1
segment
*2
device
length
- (Built into
GOT)
100m
GT25-
J71E71-100
11.2 System Configuration
GOT
Number of
connectable
GOT
equipment
model
1 GOT for 1 master
station
11 - 3
11

Advertisement

Table of Contents
loading

Table of Contents