Mitsubishi Electric GOT2000 Series Connection Manual page 63

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

1
■2. Confirming the communication state on the GOT
The Ping test can be confirmed by the Utility screen of the GOT.
For the operation method of GOT Utility, refer to the following.
GOT2000 Series User's Manual (Utility)
1 - 35
1.6 Checking for Normal Monitoring

Advertisement

Table of Contents
loading

Table of Contents