4.3
Connection Diagram
■1. The following diagram shows the connection between the GOT and the PLC.
(1) DeviceNet connection diagram 1)
DeviceNet master equipment
Power supply (V-)
Communication data Low side
(CAN_L)
Shield
Communication data High side
(CAN_H)
Power supply (V+)
*1
■2. Precautions when preparing a cable
(1) Cable length
For the Cable length, refer to the following.
➠
(2) GOT side connector (DeviceNet slave equipment)
For the GOT side connector, refer to the following.
➠
(3) DeviceNet master equipment side connector
Use the connector compatible with the DeviceNet master equipment side module.
For details, refer to the DeviceNet master equipment user's manual.
4 - 4
4.3 Connection Diagram
Cable color : Black
*1
1
Cable color : Blue
2
3
Cable color : White
4
Cable color : Red
5
*1
The power supply for communication (24 V DC) is required to supply the power to the power supply (V-) and power supply (V+).
4.2System Configuration
Manual of Anybus CompactCom M40 Network Communication Module by HMS
GOT side
(1st)
1
2
3
4
5
GOT side
(2nd)
power supply cable (V-)
1
Communication data Low side
2
(CAN_L)
Shield
3
Communication data High side
4
(CAN_H)
power supply cable (V+)
5