1. PREPARATORY PROCEDURES FOR MONITORING
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Step 1.
Setting the communication interface
Determine the connection type and channel No. to be used, and perform the communication setting.
Step 2.
Writing the project data and OS
Write the standard monitor OS, communication driver, extended function OS, project data and
communication settings onto the GOT.
Step 3.
Verifying the project data and OS
Verify the standard monitor OS, communication driver, extended function OS, project data and
communication settings are properly written onto the GOT.
Step 4.
Attaching the communication unit and connecting the cable
Mount the optional equipment and prepare/connect the connection cable according to the connection type.
Step 5.
Verifying GOT recognizes connected equipment
Verify the GOT recognizes controllers on [Communication Settings] of the Utility.
Step 6.
Verifying the GOT is monitoring normally
Verify the GOT is monitoring normally using Utility, Developer, etc.
1 - 2
1.1Setting the Communication Interface
Each chapter GOT Side Settings
1.2.1Writing the Package Data onto the GOT
1.2.2Checking the package data writing on GOT
1.3Option Devices for the Respective Connection
1.4Connection Cables for the Respective Connection
Each chapter System Configuration
Each chapter Connection Diagram
1.5Verifying GOT Recognizes Connected Equipment
1.6Checking for Normal Monitoring

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents