Air Flow Performance Of Ncs 2006 - Cisco NCS 2006 Hardware Installation Manual

Ncs 2000 series
Table of Contents

Advertisement

Installing the Air Flow Regulator
Step 9
Install the standard brackets on both sides of the chassis in front position. See
on the NCS 2006 Shelf for ETSI Rack Configuration, on page
Step 10 Check the length between the top and bottom horizontal air plenums where the chassis will be installed. The
length must be not less than 10.5 inches (267 mm). If the length is less, adjust the position of the top horizontal
plenum.
Step 11 Install the NCS 2006 empty chassis between the horizontal plenums.
Figure 102: Installing the NCS 2006 chassis below the horizontal air plenum
Step 12 Return to your originating procedure (NTP).

Air Flow Performance of NCS 2006

The tables below summarizes the air flow performance of NCS 2006:
Case
Side to Side
ETSI Front to
Rear
Deflector
Worst Line Card
Configuration
Slot (#7) Flow,
CFM
9600 RPM
(27°C)
No deflectors
16
Inlet and Outlet
8.2
Air Flow Performance of NCS 2006
DLP-L5 Mounting the Brackets
176.
Worst Controller
Card Slot (#8)
Flow, CFM
13500 RPM
9600 RPM
(40°C and 55°C)
(27°C)
22.4
14.9
11.2
6.9
Cisco NCS 2000 Series Hardware Installation Guide
13500 RPM
(40°C and 55°C)
21
10
161