Connecting Power and Ground
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Do not apply power to the shelf until you complete all installation steps.
Caution
To ensure safety of personnel and equipment, do not connect any power cables into the power module
Warning
until the module is completely installed into the chassis. Statement 389
To reduce the risk of electric shock, switch on the power only after the power cord is completely
Warning
installed into the power module. Statement 390
Procedure
Step 1
Using a voltmeter, verify the office battery and ground at the following points on the fuse panel:
a) To verify the power, place the black test lead of the voltmeter to the frame ground. Place the red test lead
on the A-side connection and verify that it is between –40.5 VDC and –57.6 VDC. Place the red test lead
on the B-side connection and verify that it is between –40.5 VDC and –57.6 VDC.
Note
The voltages –40.5 VDC and –57.6 VDC are, respectively, the minimum and maximum voltages
required to power the chassis. The nominal steady state voltage is -48 VDC.
DLP-L53 Turning On and Verifying DC Office Power on the NCS2002Shelf
Voltmeter
• Connect the chassis to the office ground. For
detailed instructions on how to ground the
chassis, refer to the
Grounding Guide for Cisco NCS 2000 Series
NTP-L30 Opening and Removing the Standard
Door of the NCS 2002 Shelf, on page 111
DLP-L50 Connecting Office Power (DC) to the
NCS 2002 Shelf (ANSI Only), on page 83
DLP-L51 Connecting Office Power (DC) to the
NCS 2002 Shelf (ETSI Only), on page 88
Required
Onsite
None

Cisco NCS 2000 Series Hardware Installation Guide

Electrostatic Discharge and
93

Hide quick links: