DLP-L4 Mounting the Bracket with Air Deflectors (Front-to-Back) on the NCS 2006 Shelf for ANSI Rack Configuration
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Caution
Use only the fastening hardware provided with the NCS 2006 to prevent loosening, deterioration, and
electromechanical corrosion of the hardware and joined material.
Procedure
Step 1
(ANSI only) Place the right front air deflector flush against the right side of the chassis (see Diagram 1 of the
figure below).
Step 2
Align the screw holes on the right front air deflector with the screw holes on the right side of the chassis.
Step 3
Insert the screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Step 4
Place the left back air deflector flush chassis as shown in Diagram 2 of the figure below.
Do not mount the left back deflector (exhaust air deflector), if these cards are to be installed in the NCS 2006
shelf:
• 100G-LC-C, 10x10G-LC, or CFP-LC
• EDRA1-26, EDRA1-35, EDRA2-26, or EDRA2-35

Cisco NCS 2000 Series Hardware Installation Guide

172
Mounting the Brackets on NCS 2006 Shelf
• #2 Phillips Dynamometric screwdriver
• Medium slot-head screwdriver
• Small slot-head screwdriver
DLP-L62 Unpacking and Verifying the Shelf , on
page 20
DLP-L63 Inspecting the Shelf, on page 22
As needed
Onsite
None