Cisco Ncs 2000 Series Hardware Installation Guide - Cisco NCS 2006 Hardware Installation Manual

Ncs 2000 series
Table of Contents

Advertisement

Installing the Cisco NCS 2002 Door and Other Modules
NTP-L40 Installing the Deep-Front Panel of the NCS 2002 Shelf
b) Align the deep-front panel pins present at the bottom of the panel with the shelf hinges (see the figure
below).
Figure 67: Align the Deep-Front Panel and Shelf
The figure below shows the deep-front panel aligned with the shelf.
Figure 68: Engage the Deep-Front Panel and Shelf

Cisco NCS 2000 Series Hardware Installation Guide

119

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 2002Ncs 201

Table of Contents