Cisco Ncs 2000 Series Hardware Installation Guide - Cisco NCS 2006 Hardware Installation Manual

Ncs 2000 series
Table of Contents

Advertisement

Mounting the Brackets on NCS 2006 Shelf
Step 5
Align the screw holes of the left back air deflector with the screw holes on the left side of the chassis.
Step 6
Insert the screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Step 7
Place the mounting bracket flush in the middle position (see Diagram 1 of the figure below) or the front
position (see Diagram 3 of the figure below) against the right side of the chassis.
Step 8
Align the screw holes on the mounting bracket with the screw holes on the left side of the chassis.
Step 9
Insert the screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Step 10 Place the mounting bracket flush in the middle position (see Diagram 1 of the figure below) or the front
position (see Diagram 3 of the figure below) against the left side of the chassis.
Step 11 Align the screw holes on the mounting bracket with the screw holes on the left side of the chassis.
Step 12 Insert the screws and tighten them to a torque value of 11.5 in-lb (1.3 N-m).
Figure 113: Mounting the Bracket with Air Deflectors (Front-to-Back) on the NCS 2006 Shelf for ETSI Rack Configuration
Step 13 Return to your originating procedure (NTP).
DLP-L7 Mounting the Bracket with Air Deflectors (Front-to-Back) on the NCS 2006 Shelf for ETSI Rack Configuration

Cisco NCS 2000 Series Hardware Installation Guide

181

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ncs 2002Ncs 201

Table of Contents