About The Documentation For The Softstarter; About The Installation And Commissioning Manual; Intended Audience; General - ABB PST Installation And Maintenance Manual

Table of Contents

Advertisement

Low Voltage Products & Systems
ABB Inc. • 888-385-1221 • www.abb-control.com
Chapter 1 - Introduction
1:1

About the documentation for the softstarter

For the softstarter, the following documents are available:
PST/PSTB Softstarters
Installation and commissioning manual
Document ID: 1SFC132001M0202 (AC1006.9)
Soft Starter Catalog
Document ID: AC1006
For other documents related to the PST Softstarters, see home page
www.abb-control.com/html/products/soft_strs.html
1:2
About the installation and commissioning
manual
This manual contains instructions on how to install and commission the
softstarter. The manual covers procedures for mechanical and electrical
installation and installation of communication devices. It also covers how to
energize, set, configure and verify settings.
For the quickest possible start, read Chapter 2 " Quickstart" .
1:2.1

Intended audience

1:2.1.1 General

The installation and commissioning manual is intended for personnel
responsible for installing, commissioning and maintaining the softstarter.

1:2.1.2 Requirements

All personnel who interact with the softstarter must have a basic knowledge
in handling electric equipment. The commissioning and maintenance
personnel must be well experienced in using this kind of equipment.
9
AC 1006.9 - 5/03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pstb

Table of Contents