Start Ramp, Second Sequence; Initial Voltage, Second Sequence; Current Limit, Second Sequence - ABB PST Installation And Maintenance Manual

Table of Contents

Advertisement

150
AC 1006.9 - 5/03
Chapter 10 - Functions

10:60 Start ramp, second sequence

Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/2nd Seq. Param./Start Ramp2
This parameter makes it possible to set the start ramp time for the
second parameter set.
Parameter
text
Start Ramp2 10 s

10:61 Initial voltage, second sequence

Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/2nd Seq. Param./Init Volt2
This parameter makes it possible to set the initial voltage for the
second parameter set.
Parameter
text
Init Volt2

10:62 Current limit, second sequence

Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/2nd Seq. Param./Curr Lim2
This parameter makes it possible to set the current limit level for the
second parameter set.
Parameter
text
Curr Lim2
Default
Setting
value
range
1... 30s,
1... 120s
Default
Setting
value
range
30%
30... 70%
Default
Setting
value
range
4 x I
2.0... 5.0xI
e
Description
Second
sequence,
time for start
ramp
Description
Second
sequence,
initial voltage
for start
ramp
Description
Second
sequence,
e
current limit
Low Voltage Products & Systems
ABB Inc. • 888-385-1221 • www.abb-control.com