Setting Current, Second Sequence; Start Ramp, Third Sequence; Initial Voltage, Third Sequence - ABB PST Installation And Maintenance Manual

Table of Contents

Advertisement

Low Voltage Products & Systems
ABB Inc. • 888-385-1221 • www.abb-control.com
Chapter 10 - Functions

10:63 Setting current, second sequence

Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/2nd Seq. Param./2nd Set Ie
This parameter makes it possible to set the rated motor current for
the second parameter set.
Parameter
text
2 Set Ie

10:64 Start ramp, third sequence

Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/3rd Seq. Param./Start Ramp3
This parameter makes it possible to set the start ramp time for the
third parameter set.
Parameter
text
Start Ramp3 10 s
10:65 Initial voltage, second sequence
Path in menu:
Menu/SETTINGS/Functional Settings/
Seq Start/3rd Seq. Param./Init Volt3
This parameter makes it possible to set the initial voltage for the
third parameter set.
Parameter
text
Init Volt3
Default
Setting
value
range
9... 1380A
divided into
Ir
19
overlapping
ranges
Default
Setting
value
range
1... 30s,
1... 120s
Default
Setting
value
range
30%
30... 70%
Description
Second
sequence,
current limit
Description
Third
sequence,
time for start
ramp
Description
Third
sequence,
initial voltage
for start
ramp
AC 1006.9 - 5/03
151

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pstb

Table of Contents