ABB PST Installation And Maintenance Manual page 15

Table of Contents

Advertisement

U= 0%
I=0.0A
Menu
Figure 1:
1
Status indication LEDs
2
LCD display
3
Selection keys for selecting, changing
and storing parameters
4
Navigation keys for navigating in the
menus
*
Arrows shown in the display indicate
that the value/menu is possible to
change or scroll
Figure 2: Standard connection PST
Power on
Fault
Protection
U = 0%
I=0.0A
Menu
Figure 3: Top level
Low Voltage Products & Systems
ABB Inc. • 888-385-1221 • www.abb-control.com
Chapter 2 - Quickstart
This chapter is a short guide on how to connect, configure and start
the softstarter in the quickest and safest way.
Warning!
Mounting and installing the softstarter shall be done in accor-
dance with local laws and regulations and must be performed
by authorized personnel only.
Do not change any parameters in the Service Settings menu.
2:1
Connection
1. Mount the softstarter according to Chapter 4 " Mounting" .
2. Be aware of the ambient temperature.
3. Connect the main circuit: terminals 1L1 - 3L2 - 5L3 to the line
4. Connect the control voltage: terminals 1 and 2
5. Connect the functional ground: terminal 3.
The wire shall be as short as possible, and be connected to the
mounting plate.The mounting plate should also be grounded.
6. Connect the start/stop circuits: terminal 4, 5, 8, 9 and 10 accord-
7. Verify that the main and control voltage corresponds to the
8. Switch on the control voltage.
9. The green "Power on" LED should be lit and the LCD should
Derating is required above 40 °C (104 °F). See Chapter 3 for
more information.
side and terminals 2T1 - 4T2 - 6T3 to the motor side.
(100-250V 50/60Hz).
ing to Figure 2.
softstarter ratings.
appear as shown in Figure 3.
15
AC 1006.9 - 5/03

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pstb

Table of Contents