Set Up Before Departure; How To Update Chart, Notes, User Chart, Chart Alerts - Furuno FEA-2807 Operator's Manual

Electronic chart display and information system (ecdis)
Hide thumbs Also See for FEA-2807:
Table of Contents

Advertisement

6.

Set up Before Departure

6.1
How to Update Chart, Notes, User Chart, Chart
Alerts
How to update chart material
Update your ARCS and S57 chart material before embarking on a new voyage. See Chapter 9 "Raster Chart
Material" for ARCS charts and section 8.2 for S57 charts.
Display and approve dates for S57 charts and manual updates
Note: It is very important that you set the Display and Approve dates for S57 charts as the current date.
There may be features that require chart viewing dates or seasonal dates in S57 charts. Accordingly, if you have not
set the Display and Approve dates as the current date there is a possibility that you may get a wrong presentation or
some feature may be absent. See section 8.11 "Chart Viewing Dates and Seasonal Features of the Vector Chart" for
the procedure.
How to create or update user chart
If necessary, create a new user chart or modify an existing one. See Chapter 15 "User Chart Control".
How to create or update Notes
If necessary, create a new Notes or modify an existing one. See Chapter 16 "Notes".
Chart alert calculation
Set chart alert areas suitable for your coming voyage. See Chapter 11 "Chart Alerts".
Retriggered Alarms
Enabled
6-1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fea-2107-bbFea-2107

Table of Contents