Huawei Quidway S6700 series Configuration Manual page 86

Hide thumbs Also See for Quidway S6700 series:
Table of Contents

Advertisement

Quidway S6700 Series Ethernet Switches
Configuration Guide - Reliability
[SwitchC-XGigabitEthernet0/0/2] port trunk allow-pass vlan 100 to 300
[SwitchC-XGigabitEthernet0/0/2] stp disable
[SwitchC-XGigabitEthernet0/0/2] quit
Step 4 Configure a protection VLAN and create the RRPP ring.
# Configure the protection VLAN on Switch A and configure Switch A as the master node of
RRPP ring 1 and specify the primary interface and secondary interface.
[SwitchA] rrpp domain 1
[SwitchA-rrpp-domain-region1] protected-vlan reference-instance 1
[SwitchA-rrpp-domain-region1] ring 1 node-mode master primary-port
xgigabitethernet 0/0/1 secondary-port xgigabitethernet 0/0/2 level 0
[SwitchA-rrpp-domain-region1] ring 1 enable
[SwitchA-rrpp-domain-region1] quit
# Configure the protection VLAN on Switch B and configure Switch B as the transit node of
RRPP ring 1 and specify the primary interface and secondary interface.
[SwitchB] rrpp domain 1
[SwitchB-rrpp-domain-region1] protected-vlan reference-instance 1
[SwitchB-rrpp-domain-region1] ring 1 node-mode transit primary-port
xgigabitethernet 0/0/1 secondary-port xgigabitethernet 0/0/2 level 0
[SwitchB-rrpp-domain-region1] ring 1 enable
[SwitchB-rrpp-domain-region1] quit
# Configure the protection VLAN on Switch C and configure Switch C as the transit node of
RRPP ring 1 and specify the primary interface and secondary interface.
[SwitchC] rrpp domain 1
[SwitchC-rrpp-domain-region1] protected-vlan reference-instance 1
[SwitchC-rrpp-domain-region1] ring 1 node-mode transit primary-port
xgigabitethernet 0/0/1 secondary-port xgigabitethernet 0/0/2 level 0
[SwitchC-rrpp-domain-region1] ring 1 enable
[SwitchC-rrpp-domain-region1] quit
Step 5 Enable RRPP.
After configuring an RRPP ring, enable RRPP on each node on the ring so that the RRPP ring
can be activated.
# Enable RRPP on Switch A.
[SwitchA] rrpp enable
# Enable RRPP on SwitchB.
[SwitchB] rrpp enable
# Enable RRPP on SwitchC.
[SwitchC] rrpp enable
Step 6 Verify the configuration.
After the configurations are complete and network become stable, run the following commands
to verify the configuration. Take Switch A for example.
l Run the display rrpp brief command on SwitchA. The following information is displayed:
Issue 01 (2011-07-15)
[SwitchA] display rrpp brief
Abbreviations for Switch Node Mode :
M - Master , T - Transit , E - Edge , A - Assistant-Edge
RRPP Protocol Status:
RRPP Working Mode: HW
RRPP Linkup Delay Timer: 0 sec (0 sec default).
Number of RRPP Domains: 1
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Enable
3 RRPP Configuration
76

Advertisement

Table of Contents
loading

Table of Contents