Huawei Quidway S6700 series Configuration Manual page 120

Hide thumbs Also See for Quidway S6700 series:
Table of Contents

Advertisement

Quidway S6700 Series Ethernet Switches
Configuration Guide - Reliability
Ring ID
Ring 1 in
domain 2
Ring 2 in
domain 1
Ring 2 in
domain 2
Ring 3 in
domain 1
Ring 3 in
domain 2
Table 3-5
Table 3-5 Edge nodes, assistant edge nodes, public port, and edge port of the subrings
Ring
ID
Ring 2
in
domain
1
Ring 3
in
domain
1
Ring 2
in
domain
2
Ring 3
in
domain
2
To reduce the Edge-Hello packets sent on the major ring and increase available bandwidth, you
can add the four subrings to a ring group.
To prevent topology flapping, you need to set the Link-Up timer on the master nodes.
Issue 01 (2011-07-15)
Master
Node
PE-AGG
CE1
CE1
CE2
CE2
shows the edge nodes, assistant edge nodes, public port, and edge port of the subrings.
Edge
Comm
Node
on Port
UPE B
XGE
0/0/1
UPE B
XGE
0/0/1
UPE B
XGE
0/0/1
UPE B
XGE
0/0/1
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Primary
Secondary Port
Port
XGE 0/0/2
XGE 0/0/1
XGE 0/0/1
XGE 0/0/2
XGE 0/0/2
XGE 0/0/1
XGE 0/0/1
XGE 0/0/2
XGE 0/0/2
XGE 0/0/1
Edge Port
Edge-
Assistant
Node
XGE 0/0/3
UPE C
XGE 0/0/4
UPE C
XGE 0/0/3
UPE C
XGE 0/0/4
UPE C
3 RRPP Configuration
Ring Type
Major ring
Sub ring
Sub ring
Sub ring
Sub ring
Common
Edge Port
Port
XGE 0/0/2
XGE 0/0/3
XGE 0/0/2
XGE 0/0/4
XGE 0/0/2
XGE 0/0/3
XGE 0/0/2
XGE 0/0/4
110

Advertisement

Table of Contents
loading

Table of Contents