Huawei Quidway S6700 series Configuration Manual page 265

Hide thumbs Also See for Quidway S6700 series:
Table of Contents

Advertisement

Quidway S6700 Series Ethernet Switches
Configuration Guide - Reliability
Figure 6-4 Networking of VRRP in load balancing mode
10.1.1.100/24
10.1.1.101/24
Device
Switch A
Switch B
Switch C
Configuration Roadmap
The configuration roadmap is as follows:
1.
2.
3.
Data Preparation
To complete the configuration, you need the following data:
Issue 01 (2011-07-15)
Backup group 2
Virtual IP Address:
10.1.1.112
HostA
HostC
Ethernet
Backup group 1
Virtual IP Address:
10.1.1.111
Interface
XGE 0/0/1
XGE 0/0/2
XGE 0/0/1
XGE 0/0/2
XGE 0/0/1
XGE 0/0/2
XGE 0/0/3
Implement networking between Switch A, Switch B, and Switch C.
Create two VRRP groups on VLANIF 100 of Switch A. Configure Switch A as the master
device in VRRP group 1 and the backup device in VRRP group 2.
Create two VRRP groups on VLANIF 100 of Switch B. Configure Switch B as the master
device in VRRP group 2 and the backup device in VRRP group 1.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
SwitchA
group 1:Master
group 2:Backup
XGE0/0/2
XGE0/0/1
SwitchC
XGE0/0/2
XGE0/0/1
SwitchB
group 2:Master
group 1:Backup
VLANIF interface
VLANIF100
VLANIF200
VLANIF100
VLANIF400
VLANIF300
VLANIF200
VLANIF400
6 VRRP and VRRP6 Configuration
XGE0/0/2
XGE0/0/1
XGE0/0/3
HostB
20.1.1.100/24
IP address
10.1.1.1/24
192.168.1.1/24
10.1.1.2/24
192.168.2.1/24
20.1.1.1/24
192.168.1.2/24
192.168.2.2/24
255

Advertisement

Table of Contents
loading

Table of Contents