Chapter 8: Maintenance; Consumables Replacement Schedule - GE Sievers InnovOx Operation And Maintenance Manual

On-line toc analyzer
Hide thumbs Also See for Sievers InnovOx:
Table of Contents

Advertisement

Chapter 8. Maintenance
To ensure optimum performance of the Analyzer, routinely perform the Analyzer maintenance described in this
chapter. Refer to Table 11 for the recommended consumables replacement schedule. Maintenance items MUST
be purchased from GE Analytical Instruments. If you need additional assistance, contact GE Analytical
Instruments Technical Support at 303. 444.2009 or 888.245.2595. Training is also available. Technical support in
the United Kingdom is available at 44 (0) 161 866 9337.
This chapter covers replacement instructions for all routine maintenance items that are replaced on a regular
schedule; instructions for non-routine maintenance items are provided in those items' packaging. A one-year
maintenance record log is provided for your reference to ensure that all required maintenance is performed
when necessary (see Table 12 on page 170).
Description
Pinch valve Tubing
Reactor Peristaltic Pump Head in Reactor Module
High Pressure Valve Tips
Sample pumps tubing (for low-pressure measurement) 3 months of operation
NDIR aerosol filter
Sample/Reagent Peristaltic Pump Head
Syringe Lubrication
Waste Tubing (Black)
GE Analytical Instruments ©2013
Table 11: Consumables Replacement Schedule
153 of 238
Typical Operating Life
3 months of operation
3 months of operation
1 month of operation
3 months of operation
3 months of operation
3 months of operation
3 months of operation
DLM 68100-06 EN Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents