Notes On Advanced Uninterruptible Power Supply (Ups); Turning The Power On Via A Lan - Fujitsu PRIMERGY TX120 User Manual

Hide thumbs Also See for PRIMERGY TX120:
Table of Contents

Advertisement

1
Click [Start] – [Administrative Tools] – [Computer Management].
2
Click [Disk Management].
3
Right-click the partition to change the letter and click [Change Drive Letter and
Path].
The [Change Drive Letter and Path] window appears.
4
Click [Edit].
The [Change Drive Letter or Path] window appears.
5
Change the drive letter.
5.5.3 Notes on Advanced Uninterruptible Power Supply
(UPS)
Note the following points when using an advanced uninterruptible power supply (referred to as UPS
afterward).
UPS shutdown time setting
Set a sufficient time interval of UPS power-off time (time from the shutdown command to the actual
power-off). If the interval is not adequate, the power will be cut off before system shutdown. It may
cause data collapse. For details, refer to the manuals of UPS and the UPS management software.

5.5.4 Turning the Power On via a LAN

You can turn the power on the server from a client (via a LAN) by utilizing the Wakeup on LAN (WOL)
function.
Be sure to install ServerView to control the power supply via a LAN.
When the power cable is disconnected from the server or the server is powered off due to power
interruption, restart the server. Unless the server is restarted, the WOL function will be disabled.
Only the onboard LAN supports the WOL function on this server. To control power supply via a LAN,
make sure you connect the onboard LAN and set the onboard LAN adapter bind to "1".
PRIMERGY TX120 User's Guide
101

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents