Wiring Loom Earset Replacement - Minelab F3Ci Service Manual

Ied and mine detector
Hide thumbs Also See for F3Ci:
Table of Contents

Advertisement

_______________________________________________________________________________________________________________________
Check speaker assembly is in good working order and the speaker cable is correctly
sealed into the speaker assembly and the E-Clip is fitted.
Check the speaker O-ring is clean, lightly greased and correctly positioned in its
channel in the detector body.
Position the speaker assembly and fit the four screws (12mm).
Assemble the detector as described in Section
c.
3.9.3 Wirin Loom Earset Replacement
a.
The wiring loom earset is a line replaceable unit and is available as a service kit, 3004-
0058 Wiring Loom Earset Kit which includes associated parts. Figure 94 illustrates the major
parts of the wiring loom earset.
9511-0158 Wiring Loom
1
3004-0058
2
9511-0158
3
4309-0069
4
4002-0053
b.
Open the detector body and remove the main PCB as described in Section
the Detector Body
and
Figure 93: Replacing Speaker Assembly
Figure 94: Wiring Loom Earset Kit
Wirin Loom Earset Kit, includes all items in this
table
Wiring Loom Earset
Dust Cap Earset Connector
Nut Earset Connector
Table 9: Wiring Loom Earset
3.3.1 - Removing the Main
3.2 - Closing the Detector
PCB. Once completed:
56
F3Ci Service Manual
Body.
4309-0069
4002-0053
3.1 - Opening

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents