Disassembly & Reassembly Procedures - Minelab F3Ci Service Manual

Ied and mine detector
Hide thumbs Also See for F3Ci:
Table of Contents

Advertisement

_______________________________________________________________________________________________________________________
3. Disassembly
This section describes the procedures required to exchange line replaceable units.
a.
Whenever a unit is replaced, mechanical and functional testing as described in Section
Mechanical & Functional Testing
b.
It is recommended that the 3004-0055 F3Ci service tool kit be used to conduct
disassembly and reassembly procedures. The tool kit contains the following:
Pull-through for coil cable
Flat blade screwdriver
3mm hex key driver
2.5mm hex key driver
2mm hex key driver
T20 Torx driver
18mm spanner
13mm spanner
10mm spanner
3mm pin punch
Screwdriver Pozidrive No 1
Screwdriver Pozidrive No 2
Tube Spanner 7/8
Silicone grease
Reassembly Procedures
must be completed.
12
F3Ci Service Manual
2 -

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents