Shutter Drive Gear - Konica Minolta bizhub C250 Service Manual

Hide thumbs Also See for bizhub C250:
Table of Contents

Advertisement

Field Service Ver. 1.0 Aug. 2006
[2]
3.4.20

Shutter drive gear

[1]
[2]
[6]
[4]
[3]
[1]
0 ~ +3 mm
9J08F2C030DA
9J08F2C526DA
[5]
[2]
[1]
9J08F2C527DA
2. Fit the blocked plate [1] as shown in
the illustration, and install the lever
[2].
Specifications: 0 to +3 mm
3. Install the elevator motor assy.
1. Remove the tray unit.
See P.18
2. Remove the tray unit front cover.
See P.16
3. Remove the tray unit rear cover.
See P.16
4. Remove four screws [1] and remove
the shutter drive gear assy [2].
5. Remove two C-rings [1] and remove
the gear 1 [2], gear 2 [3] and gear 3
[4].
NOTE
• When installing the shutter drive
gear, fit the match marks of gear 1
[5] and gear 3 [6] as shown in the
left illustration.
3. Other
41

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bizhub c252

Table of Contents