CC MIS
Installing
Release 5.x
on a new
system
2-10
Installing Release 5 on New System
Use this procedure to install CC MIS Release 5.x on a new system on
the VME.
It is highly recommended that the initial installation of CC MIS
Release 5 be performed by installation engineers.
Installation procedures use a DAT tape (described in Chapter 5).
New system
Perform the steps in the procedure below to install CC MIS Release
5.x on a new system.
Step 2-1: Installing Release 5 on a new
1. Ensure that the system is down.
2. Install the SVR4 operating system (187 or 197 platforms) or the AIX
operating system (PowerPC platform). (See Appendix C for information
on loading the operating system.)
3. Login as root and enter root password.
4. Load the CC MIS Release 5.x.
type: cd /mis
type: pwd (verify that the current directory is /mis)
Then depending on the system (187, 197, or PowerPC) type:
cpio -iBcdmu < /dev/rmt/m187_c0d5 (MVME187 / DATs)
cpio -iBcdmu < /dev/rmt/m197_c0d5 (MVME197 / DATs)
tar xp (PowerPC platform)
5 .Run the install script.
type:
cd /mis/install
type:
pwd (verify that the current directory is /mis/install)
type:
./install
A series of prompts are displayed during the installation process.
The system messages displayed include prompts for the following:
maint password
date and time
Do you want to start the system now?
6. Type exit, then refer to Step 3-1 for logging on the Maintenance
interface.
system
-or-
-or-
Release 5.2
297-2671-545