2.2 Installing the Wall-mount Managed Switch
This section describes how to install your Wall-mount Managed Switch and make connections. Please read the following topics
and perform the procedures in the order being presented.
2.2.1
Wall-mount Installation
To install the Wall-mount Managed Switch on the wall, simply follow the following steps:
Step 1: There are 4 holes with 8mm diameter on the wall; the distance between the 2 holes is 165mm and the line through
them must be horizontal.
Step 2: Install a conductor pipe inside the board hole and flush the edge of the conductor pipe with the wall surface.
Step 3: Screw the bolts into the conductor pipe. The Wall-mount Managed Switch is between bolts and conductor pipe, as
shown
below.
User's Manual of WGS-5225-8P2S Series