Planet WGS-5225-8P2SV User Manual page 150

Industrial l2+ 8-port 10/100/1000t 802.3at poe+2-port 1g/2.5g sfp wall-mount managed switch
Hide thumbs Also See for WGS-5225-8P2SV:
Table of Contents

Advertisement

Figure 4-3-29: Changes Port VLAN of Ports 1~3 to be VLAN2 and Port VLAN of Ports 4~6 to be VLAN3
For the VLAN ports connecting to the hosts, please refer to 4.3.3.6 examples. The following steps will focus on the VLAN
Trunk port configuration.
Specify Port 7 to be the 802.1Q VLAN Trunk port.
1.
Assign Port 7 to both VLAN 2 and VLAN 3 at the VLAN Member configuration page.
2.
Define a VLAN 1 as a "Public Area" that overlapping with both VLAN 2 members and VLAN 3 members.
3.
Assign the VLAN Trunk Port to be the member of each VLAN – which wants to be aggregated. For this example,
4.
add Port 7 to be VLAN 2 and VLAN 3 member port.
Specify Port 7 to be the 802.1Q VLAN Trunk port, and the Trunking port must be a Tagged port while egress.
5.
The Port-7 configuration is shown in
Figure 4-3-30: VLAN Overlap Port Setting & VLAN 1 – The Public Area Member Assign
That is, although the VLAN 2 members: Ports 1 to 3 and VLAN 3 members: Ports 4 to 6 also belong to VLAN 1. But with
different PVID settings, packets from VLAN 2 or VLAN 3 is not able to access to the other VLAN.
Repeat Steps 1 to 6, set up the VLAN Trunk port at the partner switch and add more VLANs to join the VLAN
6.
trunk, repeat Steps 1 to 3 to assign the Trunk port to the VLANs.
User's Manual of WGS-5225-8P2S Series
Figure 4-3-30.
150

Advertisement

Table of Contents
loading

This manual is also suitable for:

Wgs-5225-8p2s

Table of Contents